Pentos LMS
V2-DOC-01856

RESOLUTION AUTHORIZING THE CONVERSION OF THE ORIGINAL PROJECT"CONSTRUCTION OF WATER SYSTEM LEVEL II AT BENLI WORTH FIVE MILLION PESOS(PHP5M) WHICH IS A JOINT PROJECT OF PAMANA-DILG INTO SITIO UMABANG WATER SYSTEM LEVEL II AND SITIO BAILAN WATER SYSTEM LEVEL II IN THE AMOUNT OF PHP1,827,606.36 AND PH

Document Type
Attachment
File Format
.PDF 1.1 MB
Uploaded
June 9, 2026
Statistics

0

Views

0

Downloads