Legislative Progress
You are viewing this resolution from the
E-Library.
Comments and reactions below are shared with the E-Library document
REQUESTING ORIENTAL MINDORO ELECTRIC COOPERATIVE (ORMECO) TO REQUIRE INTERESTED BIDDER THAT A BASE LOAD OF AT LEAST ONE HALF OF THE 41 MW GUARANTEED DEPENDABLE CAPACITY POWER SUPPLY BE AVAILABE AND SUFFICIENTLY SUPPLIED IF DECLARED WINNER AS CONTRACTOR.
Return to E-Library document
RESOLUTION NO. 22-12-594 (V2-9165)
Simple Resolution
Back to E-Library
REQUESTING ORIENTAL MINDORO ELECTRIC COOPERATIVE (ORMECO) TO REQUIRE INTERESTED BIDDER THAT A BASE LOAD OF AT LEAST ONE HALF OF THE 41 MW GUARANTEED DEPENDABLE CAPACITY POWER SUPPLY BE AVAILABE AND SUFFICIENTLY SUPPLIED IF DECLARED WINNER AS CONTRACTOR
Official number: RESOLUTION NO. 22-12-594
Proponent:
HON. RAMON G. MAGBANUA
Date Approved:
December 5, 2022
Type:
Simple Resolution
Full Text
Public Comments
Sign in to like, reply, and post your own comment.
Have a formal comment or objection?
Send an official comment, objection, or suggestion about this resolution directly to the Sanggunian.
Attachments
-
REQUESTING ORIENTAL MINDORO ELECTRIC COOPERATIVE (ORMECO) TO REQUIRE INTERESTED BIDDER THAT A BASE LOAD OF AT LEAST ONE HALF OF THE 41 MW GUARANTEED DEPENDABLE CAPACITY POWER SUPPLY BE AVAILABE AND SUFFICIENTLY SUPPLIED IF DECLARED WINNER AS CONTRACTOR (693.92 KB)
Citizen sentiment
No citizen reactions yet.
Advisory only — reactions do not affect Sanggunian voting (RA 7160 §42).
Loading comments...