Legislative Progress
You are viewing this resolution from the
E-Library.
Comments and reactions below are shared with the E-Library document
RESOLUTION INTERPOSING STRONG OBJECTION OF THE MUNICIPALITY OF BULALACAO, ORIENTAL MINDORO TO THE INSTALLATION/ERECTION OF ELECTRIC TRANSMISSION STEEL TUBULAR POLES BY THE NATIONAL POWER CORPORATION (NPC) IN BUILT-IN AREAS AT THIS TOWN AND FURTHER REQUESTING THE NPC TO LOOK FOR A SUBSTITUTE LOCATION.
Return to E-Library document
RESOLUTION NO. 19-08-116-A (V2-7528)
Simple Resolution
Back to E-Library
RESOLUTION INTERPOSING STRONG OBJECTION OF THE MUNICIPALITY OF BULALACAO, ORIENTAL MINDORO TO THE INSTALLATION/ERECTION OF ELECTRIC TRANSMISSION STEEL TUBULAR POLES BY THE NATIONAL POWER CORPORATION (NPC) IN BUILT-IN AREAS AT THIS TOWN AND FURTHER REQUESTING THE NPC TO LOOK FOR A SUBSTITUTE LOCATION
Author:
HON. RAMON G. MAGBANUA
Date Approved:
August 19, 2019
Type:
Simple Resolution
Full Text
Attachments
-
RESOLUTION INTERPOSING STRONG OBJECTION OF THE MUNICIPALITY OF BULALACAO, ORIENTAL MINDORO TO THE INSTALLATION/ERECTION OF ELECTRIC TRANSMISSION STEEL TUBULAR POLES BY THE NATIONAL POWER CORPORATION (NPC) IN BUILT-IN AREAS AT THIS TOWN AND FURTHER REQUESTING THE NPC TO LOOK FOR A SUBSTITUTE LOCATION (834.82 KB)
Public Comments
Sign in to like, reply, and post your own comment.
Loading comments...