Legislative Progress
You are viewing this resolution from the
E-Library.
Comments and reactions below are shared with the E-Library document
RESOLUTION AUTHORIZING THE CONVERSION OF THE ORIGINAL PROJECT"CONSTRUCTION OF WATER SYSTEM LEVEL II AT BENLI WORTH FIVE MILLION PESOS(PHP5M) WHICH IS A JOINT PROJECT OF PAMANA-DILG INTO SITIO UMABANG WATER SYSTEM LEVEL II AND SITIO BAILAN WATER SYSTEM LEVEL II IN THE AMOUNT OF PHP1,827,606.36 AND PH.
Return to E-Library document
RESOLUTION NO. 15-09-117 (V2-9071)
Simple Resolution
Back to E-Library
RESOLUTION AUTHORIZING THE CONVERSION OF THE ORIGINAL PROJECT"CONSTRUCTION OF WATER SYSTEM LEVEL II AT BENLI WORTH FIVE MILLION PESOS(PHP5M) WHICH IS A JOINT PROJECT OF PAMANA-DILG INTO SITIO UMABANG WATER SYSTEM LEVEL II AND SITIO BAILAN WATER SYSTEM LEVEL II IN THE AMOUNT OF PHP1,827,606.36 AND PHP2,322,393.62
Author:
HON. RAMON G. MAGBANUA
Date Approved:
September 24, 2015
Type:
Simple Resolution
Full Text
Attachments
-
RESOLUTION AUTHORIZING THE CONVERSION OF THE ORIGINAL PROJECT"CONSTRUCTION OF WATER SYSTEM LEVEL II AT BENLI WORTH FIVE MILLION PESOS(PHP5M) WHICH IS A JOINT PROJECT OF PAMANA-DILG INTO SITIO UMABANG WATER SYSTEM LEVEL II AND SITIO BAILAN WATER SYSTEM LEVEL II IN THE AMOUNT OF PHP1,827,606.36 AND PH (1.1 MB)
Public Comments
Sign in to like, reply, and post your own comment.
Loading comments...